Private hangars · FBO facilities · MRO bays

Aircraft Hangar Epoxy Flooring in Vancouver, BC

Planned around your aircraft, fluids and operating schedule.

Priority One Epoxy Flooring installs hangar floor coatings for aircraft storage, fixed-base operators and maintenance facilities. From concrete preparation to the resin finish and line markings, we build the scope around your slab, traffic and available shutdown window.

Explore our Million Air YVR project
Completed light-grey hangar floor with yellow line marking at Million Air, Vancouver International Airport
Million Air · Vancouver International Airport Priority One hangar coating project
34,000 sq ft
Approximate hangar coating scope at Million Air, YVR.
Traffic & fluid review
Aircraft movements, equipment and actual chemical exposure.
A defined reopening plan
Preparation, cure and return to aircraft use considered together.
Mechanical floor-preparation equipment inside the Million Air hangar at YVR, with the airfield visible through the open doors
Mechanical surface preparation before the new hangar coating.

Completed aviation project

Million Air at YVR.
Preparation through finish.

Approximately 34,000 sq ft of aircraft hangar coating work.

Priority One Epoxy Flooring completed mechanical surface preparation and new resin flooring for Million Air at Vancouver International Airport. The photographs show the hangar during preparation and after coating, including its light-coloured finish and yellow line markings.

Project
Million Air
Location
Vancouver International Airport
Approximate area
34,000 sq ft
Scope
Surface preparation & hangar coatings
Discuss your hangar project

Select a project photograph to view it full size.

Aircraft hangar floor coating systems

Compare the complete build.
Confirm the service conditions.

A hangar floor includes preparation, repairs, primer, resin body coats and the wearing surface. We select compatible components around the traffic, fluids and maintenance conditions in each area.

Hangar coating approaches. Scroll horizontally on smaller screens.
System approach Where to consider it What to confirm
High-build epoxy with a protective topcoat Aircraft storage, corporate hangars and suitable maintenance bays. Named products, film build, wheel traffic, cleaning needs and chemical-resistance data for the proposed assembly.
Textured or broadcast resin Selected pedestrian routes, door transitions and areas exposed to tracked-in water or spills. A texture sample reviewed against footwear, small-wheel carts, cleaning methods and wet conditions.
Urethane cement Designated wet-service or wash areas where temperature and cleaning exposure justify it. Actual wash temperature, chemical exposure, drainage, thickness and connections to adjacent coating systems.
Faster-curing resin options Projects with limited shutdown windows, where the site and exposure requirements suit the selected chemistry. Application conditions, ventilation, recoat windows and separate cure requirements for aircraft traffic and chemical service.

The terms “epoxy,” “urethane” and “polyaspartic” describe families of materials. The manufacturer’s data for the named products and full build determines suitability.

Already have a coating specification? Send it with the floor area, fluid list and shutdown dates for a scope review.

Request a System Review

Skydrol® & aviation fluid exposure

Match the coating
to the actual fluid.

Fuel resistance alone does not establish suitability for every hydraulic fluid, cleaner or de-icer. We review the actual products and contact conditions before proposing the coating system.

Identify the products

Provide the hydraulic fluid names, including the Skydrol® grade where used, alongside fuels, lubricants, degreasers and cleaning products.

Define the exposure

Explain where spills occur, their likely duration, temperature and concentration, and the cleaning process used to remove them.

Check the named system

Review the proposed manufacturer’s current resistance data and obtain technical confirmation where the exposure needs it.

The floor specification and spill-response routine work together. Any containment or static-control requirement should be identified in the facility brief.

Private · Corporate · Maintenance

Different hangars.
Different working conditions.

Aircraft parking, towing, maintenance and pedestrian access place different demands on a floor. We review the layout and operations before deciding where the finish or detail should change.

  • Aircraft and equipment: wheel types, turning routes, tugs, stands, jacks and point-load requirements.
  • Concrete and details: existing coatings, contamination, moisture, joints, spalls, door edges and service covers.
  • Day-to-day use: fluid exposure, footwear, cleaning equipment, appearance and access between bays.
Private & aircraft storage hangars

Review aircraft parking, wheel movement, occasional servicing and cleaning. Select a finish that suits the actual exposure, desired appearance and maintenance routine.

Corporate & FBO facilities

Coordinate aircraft movements, tugs, service carts, staff access and presentation. Agree the coating zones, line layout and aircraft relocation sequence with the operator.

MRO & aircraft maintenance bays

Map fluid exposure, wheeled tooling, stands, repair areas and cleaning conditions. The specification may vary between maintenance bays, tow paths and wet-service zones.

Concrete preparation & installation

The surface below
the finish matters.

The existing slab determines the preparation and repair scope. We review old coatings, contamination, moisture concerns and damaged areas before selecting the primer and coating build.

Movement joints need an appropriate detail through the finished floor. Door thresholds, drain edges, service covers and changes in system should also be included in the proposal.

Build a clearer coating quote
  1. Survey and agree the scope

    Confirm floor areas, existing conditions, testing needs, operational zones and the proposed assembly. Coordinate aircraft and equipment access.

  2. Prepare and repair

    Remove unsuitable coatings, address contamination and mechanically prepare the concrete to the selected system’s requirements. Complete the agreed repairs and details.

  3. Install the coating assembly

    Apply compatible primers, resin body coats, specified texture and finish within the manufacturer’s application conditions and recoat windows.

  4. Complete markings and handover

    Apply the agreed layout using compatible materials. Review inspections, cure milestones, cleaning guidance and the return-to-use conditions.

Installation around aviation operations

Plan the shutdown.
Define the reopening.

The programme includes access, preparation, repairs, application and curing. We assess whether phasing is practical against the facility layout and aircraft schedule.

Aircraft & work boundaries

Agree relocation, isolation, adjacent-aircraft protection, material routes, airport access arrangements and controls for dust, odour and ventilation.

Phases & tie-ins

Review how each section connects to the next. Include temporary access, turning routes, thresholds and the time needed between phases.

Separate cure milestones

Confirm when foot traffic, aircraft movements, equipment loading, wet cleaning and chemical exposure can resume under the selected system’s conditions.

Appearance · Visibility · Wayfinding

A clear floor.
A considered line layout.

Light-coloured finishes can help make spills and dropped items more visible. Review the colour and sheen under your hangar lighting, together with glare, tyre marks and cleaning expectations.

Plan aircraft parking outlines, pedestrian routes, equipment areas and tow paths with the operations team. Agree the layout, line colours and compatible marking system before installation.

Floor visibility supports inspections and housekeeping alongside the facility’s foreign object debris (FOD) procedures.

Explore the colour direction

Light finish
Light grey
Mid grey
Line contrast

Illustrative colour directions. Availability, final colour, texture and sheen depend on the selected system; approve a physical sample.

View the full epoxy colour chart

Budget & scope

What does hangar
floor coating cost?

The floor area is the starting point. Existing coating removal, oil contamination, repairs, moisture treatment and the required chemical-resistant build can change the scope substantially.

  • Preparation: removal, mechanical profiling, contamination treatment and testing.
  • Repairs and details: cracks, spalls, joints, door edges, drains and service covers.
  • Coating and markings: named products, thickness, texture, colours and line layout.
  • Operations: airport access, aircraft relocation, mobilisation and phased working.

Compare quotes on the complete build and included details as well as price per square foot. Ask for preparation allowances, exclusions and cure conditions in writing.

Aircraft hangar flooring questions

Clearer requirements.
Better flooring decisions.

Discuss the fluids, concrete, traffic and installation window before deciding on the coating system.

What is the best coating for an aircraft hangar?

The appropriate system depends on the slab, traffic, fluids and shutdown window. High-build epoxy with a compatible protective topcoat is one option. Selected wet-service, textured or static-control areas may require a different assembly.

Will an epoxy floor resist Skydrol®?

Confirm the exact fluid and exposure conditions against current manufacturer data for the proposed products. A general chemical-resistance or fuel-resistance claim is insufficient. The complete coating build and spill-cleaning routine also matter.

Can you recoat an existing hangar floor?

Recoating may be possible after assessing adhesion, compatibility, contamination and moisture. Sound material may be suitable for preparation and recoating; unsuitable or failing coatings require removal. A test area may be needed to confirm the approach.

Can aircraft remain in another part of the hangar?

That depends on the work, materials, isolation, ventilation and aircraft-protection requirements. We review aircraft relocation and adjacent operations with the facility team before proposing phases. Some work may require a wider shutdown.

Does every hangar need ESD flooring?

Static-control requirements are defined by the operations and facility specification. Where required, flooring, grounding and verification need to form a compatible system. For component and electronics work, explore our aerospace and avionics flooring service .

How long before aircraft can use the floor?

The named coating system, installed build and site conditions determine the cure period. Foot traffic readiness can differ from readiness for aircraft, equipment loads, wet cleaning or chemical exposure. We include the required milestones in the installation plan.

Do you install hangar floors outside Vancouver?

We serve Vancouver and Metro Vancouver, with mobilisation for selected larger hangar projects elsewhere in British Columbia. Send the location, area and schedule so we can review the practical scope.

Other areas within your aviation facility

Vancouver · Metro Vancouver · Selected BC hangar projects

Your aircraft.
Your hangar. A defined flooring plan.

Bring us the location, floor area, fluid list and shutdown window. We’ll review the preparation, coating assembly, markings and practical next steps with you.