Reception & corridors
Review tracked-in rain, pedestrian traffic, carts and the cleaning routine. Select colour, sheen and texture together, with clear transitions at entrances and adjoining floors.
Police facilities · Epoxy & resin systems
Priority One Epoxy Flooring installs resin floors for police station corridors, locker rooms, property rooms and service bays. We match the finish to each area’s traffic, cleaning and moisture exposure, with installation planned around facility access and approved work windows.
For facility teams, consultants and general contractors across Vancouver and the Lower Mainland.
Flooring by area
A public entrance, a wet locker room and a vehicle bay need different finishes. Our police station flooring assessment starts with the room list, existing concrete and operational requirements, then defines a suitable resin system and installation scope for each area.
Review tracked-in rain, pedestrian traffic, carts and the cleaning routine. Select colour, sheen and texture together, with clear transitions at entrances and adjoining floors.
Plan for repeated cleaning, rolling equipment and busy circulation routes. Confirm the approved finish, wall-to-floor details and access sequence with the facility team.
Balance wet-area traction with practical cleaning. Review floor falls, drains, locker bases and cove details; a coating alone does not correct ponding or replace a specified waterproofing assembly.
Assess shelving, trolley routes and equipment loads. A continuous resin finish can simplify cleaning, while damaged joints and thresholds need separate attention before coating.
Match the system to tyre traffic, oils, cleaning chemicals and washdown conditions. Check drainage, contamination and the required vehicle return-to-service window.
Review these areas against the owner’s approved specification. Resin type, edges, coves, penetrations and repair details must be accepted for the particular room before installation.
Systems & interfaces
Solid-colour epoxy, decorative flake and quartz-broadcast systems offer different appearances and textures. Primer, resin layers, aggregate and topcoat must work together for the assessed substrate and room use.
For wet or demanding service areas, we review whether a different resin build or a specified membrane assembly is needed. Chemical resistance is checked against the actual products, concentrations and exposure conditions.
Explore colours & finish optionsPolice facility spaces
Police facilities combine secure rooms, circulation routes and controlled building access. Each area needs its own review of floor interfaces, maintenance requirements and the installation sequence.
Installation planning
Phasing is considered before installation. The facility team confirms available rooms, temporary routes, contractor access and closure windows. Preparation and curing may require a room or zone to be taken out of service.
Review the room schedule, slab condition, existing finishes, moisture exposure and drawings available for pricing.
Confirm repairs, finish samples, interfaces, work zones, dust management, ventilation and facility access conditions.
Prepare and repair the substrate, then install the agreed system within the approved sequence and site conditions.
Set separate milestones for foot traffic, equipment, wet cleaning and vehicle use using the selected system’s cure requirements.
Project scope & pricing
Pricing depends on more than floor area. Removal, concrete repairs, moisture treatment, resin build, coves, drainage details and phased access all affect the scope.
Questions before specification
No. Epoxy and resin systems can suit many concrete corridors, staff areas, storage rooms and service spaces. The room’s moisture, cleaning, traffic, comfort and security requirements determine suitability. Fitness spaces and other specialist rooms need separate review.
Only where the complete assembly is specified and approved for the room. The owner and responsible design team must review resin properties, wall-to-floor junctions, edges, joints and penetrations. An ordinary commercial coating should not be assumed suitable.
Texture can be selected for the expected water exposure, footwear and cleaning routine. Review a sample before approval and resolve drainage at the same time. No finish removes the need for cleaning, spill control and maintenance.
Some projects can be divided into approved work zones while other areas remain in use. Feasibility depends on alternative routes, dust and ventilation controls, access and curing. The area being prepared and coated may need a full closure.
Timing depends on the resin system, preparation and repairs, temperature, humidity and intended use. Foot traffic, equipment, vehicle use and wet cleaning can have different release times. Confirm these milestones in the project schedule.
The existing floor must be assessed first. Weak coatings, incompatible adhesives and unsuitable tile assemblies may require removal. Preparation, moisture conditions and adhesion requirements determine the accepted substrate.