Priority One Epoxy Flooring installs concrete floor coatings for
Maple Ridge garages, workshops and businesses. Diamond grinding,
specified repairs and a coating matched to your floor's use form
the foundation of every project. Compare finishes, review our local
garage project and get a clear written quote.
20+ years of flooring experience500+ completed flooring projects720 sq ft Maple Ridge garage project
Local Project · Completed August 2026
Maple Ridge Garage Project: 720 Sq Ft of Full-Flake Flooring
This approximately 720 sq ft tandem garage received a Wombat decorative
flake finish. The project combined concrete preparation, selected
joints filled flush and a clear protective topcoat for everyday
vehicle parking and household use.
Project Details
Location
Maple Ridge, BC
Space
Residential tandem garage
Floor area
Approximately 720 sq ft
Finish
Wombat full-flake broadcast
Vehicle-use plan
Five-day cure allowance
Preparation & Coating Scope
Mechanical diamond grinding of the concrete.
Localized surface and minor crack repairs.
Selected saw-cut control joints filled and finished flush.
Epoxy base coat with full decorative flake coverage.
Clear polyaspartic protective topcoat.
Joint treatment, repairs and parking dates were part of this
project's scope. We confirm those details separately for your
concrete and selected coating system.
Floor Coatings for Maple Ridge Garages, Shops & Businesses
Choose the floor around its daily use. Parking a family vehicle,
working with tools and moving loaded pallet jacks create different
wear patterns, repair needs and cleaning requirements.
Residential Garage Floor Coatings
Full-flake flooring provides decorative coverage for attached and
detached garages. We discuss colour, wet-tire traction, old paint,
damaged concrete and sunlight at the door. A compatible clear
polyaspartic topcoat can provide UV resistance over the flake system.
Tool storage, jacks, equipment, mud and workshop spills call for
practical texture and a suitable wear layer. Full-flake,
solid-colour epoxy or quartz systems can be considered after
reviewing the slab, wheel traffic and work carried out in the space.
Describe equipment use and any oils or cleaners when requesting your quote.
Commercial Interiors & Service Bays
Retail support rooms, studios, utility spaces and service units
need a finish that works with foot traffic, rolling loads and
regular cleaning. We plan repairs, colour, surface texture and
access around the space and its reopening requirements.
Concentrated wheel traffic, turning areas and damaged joints need
attention before coating. Wet cleaning, heat or chemical exposure
may require a higher-build resin or urethane-cement system, with
performance checked against the actual operating conditions.
How Much Does Epoxy Garage Flooring Cost in Maple Ridge?
For a standard full-flake garage system, our published planning range is
$8.50–$11.50 per sq ft CAD. Your written quote is based on
measured area, concrete condition, preparation, repairs and the selected
coating build. Shop and commercial floors require their own specification.
A 400 Sq Ft Garage Budget Example
A 20 × 20 ft garage calculates to $3,400–$4,600 CAD
at the full-flake planning rate. Minimum project charges, extra
repairs, coating removal, moisture treatment and vertical surfaces
can change the total. The quote confirms inclusions and applicable taxes.
Flake and quartz describe the broadcast finish. Epoxy and polyaspartic
describe resin materials that can be used in compatible layers of the
same floor. Compare the complete system, including preparation and topcoat.
Starting points for selecting a finish. Scroll sideways on smaller screens.
Finish
Often considered for
What to agree before installation
Full-flake with clear topcoat
Residential garages, home workshops and selected utility rooms
Flake colour, full coverage, compatible resin layers, final texture and UV exposure.
Solid-colour epoxy
Workshops, storage rooms and commercial interiors
Coating thickness, wheel traffic, traction additive and resistance to the actual cleaners or spills.
Quartz broadcast resin
Textured service floors and suitable wet commercial areas
Aggregate profile, sealed texture, cleaning method and any cove or drain detailing.
Full-flake finish example from our broader garage portfolio. This photo illustrates the finish style, rather than the Maple Ridge project above.
Choose Texture as Well as Colour
Review a physical flake or quartz sample and discuss the sealed
surface. Wet boots, tires, workshop spills and cleaning equipment
influence the right amount of texture. Decorative flake alone does
not establish wet slip resistance.
A specified polyaspartic topcoat can provide UV resistance and
faster curing, but the product's moisture, temperature and
return-to-service limits still govern installation.
A floor coating bonds to the prepared concrete beneath it. We assess
old paint, sealers, oil contamination, weak surface material and damage
before recommending preparation and coating layers.
Grinding, Cracks & Joint Treatment
Mechanical grinding creates the surface profile needed by the
selected system. Repair materials and preparation are matched to
cracks, pits and spalled areas. We distinguish saw-cut control
joints from joints that must accommodate movement, then agree
which remain visible and which can be filled.
Ongoing concrete movement can cause cracks to reappear through a coating.
Slab Moisture & Application Conditions
Rainwater brought in by a vehicle and moisture moving through the
slab need different responses. Testing, primer selection and any
mitigation must suit the concrete and product limits. Slab
temperature, humidity and condensation risk also influence the
work window, especially in unheated detached shops.
Existing leaks or ongoing water entry need to be addressed in the project plan.
Installation & When You Can Use the Floor Again
Plan for both installation and curing. The schedule depends on floor
size, removal and repairs, coating layers and site conditions. Your
handover should distinguish walking, moving belongings and vehicle parking.
Assess & Agree the Scope
Review dimensions, floor photos, use and access. Confirm preparation, repairs, finish samples, quote inclusions and work dates.
Prepare & Repair
Clear the work area, mechanically prepare the concrete and complete the specified repairs and joint treatment.
Install the Coating System
Apply the specified base, broadcast and topcoat within the system's application and recoat requirements.
Cure & Hand Over
Follow the agreed waiting periods for people, vehicles and equipment, then use the supplied cleaning and maintenance instructions.
Parking example: the documented Maple Ridge tandem
garage allowed five days before vehicle use. Your parking date is
confirmed for your system and conditions; a fast-curing topcoat
does not mean every garage is ready for vehicles the next day.
Maple Ridge Floor Coating Questions
Can you coat a garage that already has paint or a sealer?
Often, yes. We assess the existing layer and its bond, then specify removal or other preparation needed for the new system. Loose paint, weak concrete and contamination must be addressed before coating.
Is epoxy or polyaspartic better for a garage?
They can work together. An epoxy base with full-flake broadcast and a compatible polyaspartic topcoat is one option. The choice depends on the slab, moisture, application conditions, sunlight and the required parking schedule.
Should the control joints be filled before coating?
That is decided after reviewing the joints and slab. Suitable saw-cut control joints may be filled with a specified joint material, while movement joints need appropriate detailing. Our Maple Ridge tandem garage included selected joints filled flush.
Will a coated garage floor be slippery when wet?
Water, oils and other contamination can make a coated floor slippery. Aggregate and final topcoat texture can improve traction. We balance the required grip with cleaning needs, footwear and how the garage is used.
Can you coat a damp slab in a detached shop?
The moisture source, test results and product limits determine the next step. A suitable mitigation system may be needed, or water entry may need correction first. An unheated building also needs workable slab temperature and humidity during installation.
What do I need to move before installation?
The work area needs to be clear for grinding, repairs and coating. Discuss fixed cabinetry, appliances, heavy equipment and access at the assessment so the scope identifies what stays and what must be moved.
How do I clean and maintain the new floor?
Remove grit regularly, clean spills promptly and use cleaners compatible with the installed system. Rinse away cleaning residue and follow the handover instructions. Textured workshop floors may need suitable scrubbing equipment.
Get Your Maple Ridge Epoxy Flooring Quote
We quote garage, shop and commercial floor coating projects across
Maple Ridge, including Hammond, Albion, Silver Valley and Whonnock.
Send your project address, approximate floor area, wide photos and
close-ups of damage. Include the intended use and preferred work dates.